Trash to Treasure

Low Cost and No Cost Feed Stocks Processed into High Margin Products



Our Processing Systems

Our Modular Processing Systems easily convert:

  • GREEN TECHNOLOGIES:
  • A wide range of low-value/low-cost renewable and sustainable Biomasses (sawdust, crop waste, municipal. etc.) into clean, net zero,  improved mileage, up to 90 Cetane, R99 Diesel, Commercial Jet Fuel,  Specialty Green Solvents and Oils, specialty carbons (sequestered),  biodegradable, plastics, etc.,
  • PETROLEUM MANAGEMENT TECHNOLOGIES:
  • Plus, diverse raw materials such as used motor, crude oil, off-spec feeds, etc. into a wide range of high margin, high purity, lubricants and non-highway mineral oil, mineral spirits, paraffin waxes, biodegradable plastics, sequestered specialty carbons, etc.

Our Technologies

Trash2Treasure has opened a new technological window to many significant benefits and features:

  1. A very competitive and cash generating asset opportunity;
  2. Provides protection from inflation;
  3. A huge potential growth opportunity;
  4. From 8 + times to 80 + times lower CAPEX per processed barrel;
  5. From 4 + to 10 + times higher EBITDA per processed barrel;
  6. Higher catalytic cracking expandable capacity with a very small footprint and cost;
  7. Easy and quick conversion of a wide range of no cost/ low-cost biomass and petroleum feedstocks into high value products;
  8. Easy to construct and commission within only 3 to 4 months vs. a typical of construction window of 23 months or more;
  9. Little to no air quality permitting;
  10. Processing Systems are easily transported by truck transport and 40-foot shipping container on a worldwide basis;
  11. Easy and rapid capacity expansion opportunity;
  12. Designed for continuous operation for 25 years to 35 years or more;
  13. Easy to operate with safe and highly efficient designs;
  14. Lowest operating costs and maintenance costs;
  15. Low-cost expandability of the systems into groups or clusters;
  16. Rapid payback within a few months;
  17. "Set it, and Forget it" axial flow designed operating systems
  18. Strong and Clear Vision;
  19. Individual Systems are easily scaled to millions of gallons per year;
  20. Investment partner centric with quick payback.

The Design, Processing Capacity, and Economics

Design and Engineering:

  • From 8 + times to 50 + times lower CAPEX per processed barrel;
  • Higher catalytic cracking expandable capacity with a very smaller footprint and cost;
  • Easy to construct and commission within only 3 to 4 months compared with typical construction times of 23 months or more;
  • Little to no air quality permitting;
  • Easily transported by truck transport and 40-foot shipping container on a worldwide basis;
  • Designed for continuous operation for 25 years or more based on feed;
  • Easy to operate with safe and highly efficient design;
  • Low-cost expand-ability of the systems into groups or clusters;
  • “Set it, and Forget it” axial flow designed operating system;
  • Individual Systems are easily scaled from 300 BPD (4.5 million  gallons per year) to 1,500 BPD (22.6 million gallons per year).


Processing Capacity:

  • The single and clustered Processing Capacities can range from between 2.5 million gallons per year to 163 million gallons per year or more.


Economics:

  • The low-cost leasable Modular Processing Systems can generate EBITDAs from about $10 million to $50 million and more. In groups of 8 to 12 or more Modular Systems can generate up to $ billion at full capacity;
  • Very competitive and cash generating asset opportunity;
  • Protection against inflation;
  • A huge potential growth opportunity;
  • Easy and quick conversion of a wide range of no cost/ low-cost biomass and petroleum feedstocks into high value products;
  • Investment partner centric quick payback;
  • Easy and rapid capacity expansion opportunity;
  • Lowest operating costs and maintenance costs.

Competitive  Advantages

The Pros:

  • Lowest Opportunity Cost;
  • Lowest Cost Provider;
  • Produces more and better products than the competition;
  • Highest efficiency;
  • Quickest time to market;
  • Produces more value products than the competition with the same  resources.


Office Locations:

  • Offices in Texas, California, Kansas


CAPEX Requirement for a new Facility:

  • Modular Processing System ranges from a single payment of about
    $1.2 million + to $2.5 million +.
  • While the total CAPEX for a single Project will vary based upon the specific Processing Systems and currently available resources/infrastructure, a full plant build out from raw land will run from approximately $2.5M to $5.2M


Share by: